Reply
 
Thread Tools Display Modes
  #1   Report Post  
Posted to microsoft.public.word.pagelayout
birdbrain64 birdbrain64 is offline
external usenet poster
 
Posts: 1
Default Templates for processes

We have many processes that vary from 1 step to 100 steps. formatting is
always a nightmare. How would you create a template that is expandable.
Please help me understand how to create a template based on this format:

OP-015 Exempting Generation Resources from Uninstructed Deviation
Document Change History
Issue No
Reason for Issue
Revised By
Issue Date
Effective Date
Owner Approval
OP-015-0
Creation of Procedure
MISO Staff
11/01/06
12/1/06
Yes
15.1 Overview
Under the provisions of EMT Section 40.3.4, €śGeneration Resources shall not
be subject to Uninstructed Deviation Penalties for any Uninstructed Deviation
caused solely by events or conditions beyond the control, and without the
fault or negligence, of the Market Participant, including but not limited to:
(1) Emergencies;
(2) Test mode of the Resource; or
(3) Start-up or shut-down mode of the Generation Resource; or
(4) Instances when a Generation Resource trips and goes off-line after
receiving Dispatch Instructions from the Transmission Provider. €ś
15.2 Procedure
Midwest ISO will grant exemption from Uninstructed Deviation Penalties in
the following circumstances:
15.3 Unit Starts - When a Generation Operator calls to inform the Midwest
ISO that a Generation Resource has synchronized with the grid. The Start
instruction (issued by Midwest ISO in either the Day Ahead Energy Market,
Forward Reliability Assessment and Commitment (€śRAC€ť), Intra-Day RAC or Real
Time Energy Market) indicates when the Resource(s) should be online and
available for dispatch instructions. Uninstructed Deviation Penalty Exemption
(UDE) will be granted from the time the Generation Operator calls to inform
the Regional Generation Dispatcher (RGD) that the unit has synchronized to
the transmission grid through the startup period as defined in the Unit
offer. Normally this will be the cold startup time but could also be the
intermediate or hot startup time, depending upon the state of the unit. For
Quick Start Generation Resources (i.e., units that have startup of 15 minutes
or less), UDE will be given for the hour in which the unit synchronizes if it
occurs between the top of the hour and 45 minutes past the top. If a Quick
Start Generation Resource synchronizes between 46 minutes past the top of the
hour and the top of the following hour, UDE will be granted for two hours
(the hour in which the Resource synchronizes and the next hour). If this
period of time (when the unit synchronizes to the grid plus startup time)
extends past the Midwest ISO issued Start Time, UDE will not be granted past
the Midwest ISO issued Start Time.
In all cases, the Generation Operator must contact their Midwest ISO
Regional Generation Dispatcher to be granted UDE - according to the
provisions laid out in this document.
Notification Requirements
MISO Real Time Operating Procedure
Page 2 of 3
Effective December 1st 2006
€˘ Generation Operator to contact MISO Regional Generation Dispatcher any
time a unit synchronizes to the grid.
€˘ Generation Operator to contact MISO Regional Generation Dispatcher any
time a unit that has been synchronized to the grid will not be available for
dispatch at the Midwest ISO issued start time.
€˘ Any unit with a Startup time of 30 minutes or less requires only one call
to the MISO Regional Generation Dispatcher €“ at the time it synchronizes to
the grid.
15.4 No MISO Start - Units that do not have a Midwest ISO start and have not
called at least 30 minutes prior to synchronizing with the grid will not
receive UDE. However, units that are started by a Generation Operator for
reliability reasons will be provided UDE at the Participants request for the
startup and shutdown periods.
15.5 Economic Decision - If a Participant receives a Midwest ISO start and
chooses not to start because of economics, the Midwest ISO RGD will give the
unit a €śStop by Company€ť (also called an €śUnavailable by Company Stop€ť). This
is done so that these units will not appear to be online in subsequent RAC
calculations. If the unit comes online during the remainder of the original
Midwest ISO commitment period, the unit will not be eligible for UDE unless
the unit was called on by Midwest ISO.
15.6 Generation Resource Shutdown- The Stop instruction (issued by Midwest
ISO in either the Day Ahead Energy Market, Forward RAC, Intra-Day RAC or Real
Time Energy Market) indicates when the unit is released from following
dispatch instructions, not when the unit should be offline. UDE will be
provided at the time of the Midwest ISO issued Stop time for up to the length
of startup time in the Resource Offer. If the Generation Operator wants to
take the unit below Economic Minimum before the Stop Time issued by Midwest
ISO, UDE will not be provided until the Stop Time.
15.7 Equipment failure - If a unit experiences mechanical difficulties,
(i.e., failure of pumps, fans, mills, etc.) UDE will be granted for a maximum
of one Hour (up to two Hour Endings) so that Generation Operators may update
their offer. Midwest ISO Regional Generation Dispatchers will also update
offers if requested for the same period of time.
UDE will not be granted for extended periods of time except for issues that
directly affect a Resources ability to follow dispatch instructions.
Examples of this would be wet coal, new control systems or a failure of
portions of a Resources control system. Units that are returning from a
major overhaul would also qualify for extended UDE if requested for a
reasonable period of time in which to stabilize the unit. In all other cases,
UDE will be provided for a maximum of two hours so a Generation Operator can
update its offer.
15.8 Resource testing- Prior to a unit coming online for testing, the
Generation Operator must call the Midwest ISO Regional Generation Dispatcher
(RGD), indicate the duration of the proposed test and obtain approval for the
test. If the test is approved, UDE will be granted for the duration of the
test. If Midwest ISO cannot approve the test, UDE will not be granted.
Reasons for not
MISO Real Time Operating Procedure
Page 3 of 3
Effective December 1st 2006
granting the test may include, but are not limited to, energy needs on a
peak day, energy surplus conditions or if a unit may be needed to address
congestion.
15.9 Resources Trips- If a unit is online and suddenly goes offline (i.e.,
the Resource goes from generating energy to zero output in less than 15
minutes), UDE will be granted for the Hour(s) in which the trip occurred if
requested by the Generation Operator.
15.10 Manual Redispatch - Units that are directed to move as part of Manual
Redispatch and follow Midwest ISO instructions will be granted UDE for the
duration of the event.
15.11 Dynamically Scheduled JOUs- When any share (physical or commercial
share of a Dynamically Scheduled Unit) is granted UDE, all shares shall be
granted UDE.
  #2   Report Post  
Posted to microsoft.public.word.pagelayout
Shauna Kelly Shauna Kelly is offline
external usenet poster
 
Posts: 571
Default Templates for processes

Hi birdbrain

Start with the information at these pages:

Creating a Template - The Basics (Part I)
http://www.word.mvps.org/FAQs/Custom...platePart1.htm

Creating a Template (Part II)
http://www.word.mvps.org/FAQs/Custom...platePart2.htm

How to create numbered headings or outline numbering in your Microsoft Word
document
http://www.ShaunaKelly.com/word/numb...Numbering.html

Hope this helps.

Shauna Kelly. Microsoft MVP.
http://www.shaunakelly.com/word


"birdbrain64" wrote in message
...
We have many processes that vary from 1 step to 100 steps. formatting is
always a nightmare. How would you create a template that is expandable.
Please help me understand how to create a template based on this format:

OP-015 Exempting Generation Resources from Uninstructed Deviation
Document Change History
Issue No
Reason for Issue
Revised By
Issue Date
Effective Date
Owner Approval
OP-015-0
Creation of Procedure
MISO Staff
11/01/06
12/1/06
Yes
15.1 Overview
Under the provisions of EMT Section 40.3.4, "Generation Resources shall
not
be subject to Uninstructed Deviation Penalties for any Uninstructed
Deviation
caused solely by events or conditions beyond the control, and without the
fault or negligence, of the Market Participant, including but not limited
to:
(1) Emergencies;
(2) Test mode of the Resource; or
(3) Start-up or shut-down mode of the Generation Resource; or
(4) Instances when a Generation Resource trips and goes off-line after
receiving Dispatch Instructions from the Transmission Provider. "
15.2 Procedure
Midwest ISO will grant exemption from Uninstructed Deviation Penalties in
the following circumstances:
15.3 Unit Starts - When a Generation Operator calls to inform the Midwest
ISO that a Generation Resource has synchronized with the grid. The Start
instruction (issued by Midwest ISO in either the Day Ahead Energy Market,
Forward Reliability Assessment and Commitment ("RAC"), Intra-Day RAC or
Real
Time Energy Market) indicates when the Resource(s) should be online and
available for dispatch instructions. Uninstructed Deviation Penalty
Exemption
(UDE) will be granted from the time the Generation Operator calls to
inform
the Regional Generation Dispatcher (RGD) that the unit has synchronized to
the transmission grid through the startup period as defined in the Unit
offer. Normally this will be the cold startup time but could also be the
intermediate or hot startup time, depending upon the state of the unit.
For
Quick Start Generation Resources (i.e., units that have startup of 15
minutes
or less), UDE will be given for the hour in which the unit synchronizes if
it
occurs between the top of the hour and 45 minutes past the top. If a Quick
Start Generation Resource synchronizes between 46 minutes past the top of
the
hour and the top of the following hour, UDE will be granted for two hours
(the hour in which the Resource synchronizes and the next hour). If this
period of time (when the unit synchronizes to the grid plus startup time)
extends past the Midwest ISO issued Start Time, UDE will not be granted
past
the Midwest ISO issued Start Time.
In all cases, the Generation Operator must contact their Midwest ISO
Regional Generation Dispatcher to be granted UDE - according to the
provisions laid out in this document.
Notification Requirements
MISO Real Time Operating Procedure
Page 2 of 3
Effective December 1st 2006
. Generation Operator to contact MISO Regional Generation Dispatcher any
time a unit synchronizes to the grid.
. Generation Operator to contact MISO Regional Generation Dispatcher any
time a unit that has been synchronized to the grid will not be available
for
dispatch at the Midwest ISO issued start time.
. Any unit with a Startup time of 30 minutes or less requires only one
call
to the MISO Regional Generation Dispatcher - at the time it synchronizes
to
the grid.
15.4 No MISO Start - Units that do not have a Midwest ISO start and have
not
called at least 30 minutes prior to synchronizing with the grid will not
receive UDE. However, units that are started by a Generation Operator for
reliability reasons will be provided UDE at the Participant's request for
the
startup and shutdown periods.
15.5 Economic Decision - If a Participant receives a Midwest ISO start and
chooses not to start because of economics, the Midwest ISO RGD will give
the
unit a "Stop by Company" (also called an "Unavailable by Company Stop").
This
is done so that these units will not appear to be online in subsequent RAC
calculations. If the unit comes online during the remainder of the
original
Midwest ISO commitment period, the unit will not be eligible for UDE
unless
the unit was called on by Midwest ISO.
15.6 Generation Resource Shutdown- The Stop instruction (issued by Midwest
ISO in either the Day Ahead Energy Market, Forward RAC, Intra-Day RAC or
Real
Time Energy Market) indicates when the unit is released from following
dispatch instructions, not when the unit should be offline. UDE will be
provided at the time of the Midwest ISO issued Stop time for up to the
length
of startup time in the Resource Offer. If the Generation Operator wants to
take the unit below Economic Minimum before the Stop Time issued by
Midwest
ISO, UDE will not be provided until the Stop Time.
15.7 Equipment failure - If a unit experiences mechanical difficulties,
(i.e., failure of pumps, fans, mills, etc.) UDE will be granted for a
maximum
of one Hour (up to two Hour Endings) so that Generation Operators may
update
their offer. Midwest ISO Regional Generation Dispatchers will also update
offers if requested for the same period of time.
UDE will not be granted for extended periods of time except for issues
that
directly affect a Resource's ability to follow dispatch instructions.
Examples of this would be wet coal, new control systems or a failure of
portions of a Resource's control system. Units that are returning from a
major overhaul would also qualify for extended UDE if requested for a
reasonable period of time in which to stabilize the unit. In all other
cases,
UDE will be provided for a maximum of two hours so a Generation Operator
can
update its offer.
15.8 Resource testing- Prior to a unit coming online for testing, the
Generation Operator must call the Midwest ISO Regional Generation
Dispatcher
(RGD), indicate the duration of the proposed test and obtain approval for
the
test. If the test is approved, UDE will be granted for the duration of the
test. If Midwest ISO cannot approve the test, UDE will not be granted.
Reasons for not
MISO Real Time Operating Procedure
Page 3 of 3
Effective December 1st 2006
granting the test may include, but are not limited to, energy needs on a
peak day, energy surplus conditions or if a unit may be needed to address
congestion.
15.9 Resources Trips- If a unit is online and suddenly goes offline (i.e.,
the Resource goes from generating energy to zero output in less than 15
minutes), UDE will be granted for the Hour(s) in which the trip occurred
if
requested by the Generation Operator.
15.10 Manual Redispatch - Units that are directed to move as part of
Manual
Redispatch and follow Midwest ISO instructions will be granted UDE for the
duration of the event.
15.11 Dynamically Scheduled JOUs- When any share (physical or commercial
share of a Dynamically Scheduled Unit) is granted UDE, all shares shall be
granted UDE.



  #3   Report Post  
Posted to microsoft.public.word.pagelayout
Doug Robbins - Word MVP Doug Robbins - Word MVP is offline
external usenet poster
 
Posts: 8,832
Default Templates for processes

You may also want to see:

"How to create a Userform" at:

http://word.mvps.org/FAQs/Userforms/CreateAUserForm.htm

and the following series of artciles:

Please Fill Out This Form
Part 1: Create professional looking forms in Word
http://www.computorcompanion.com/LPMArticle.asp?ID=22

Part 2: Adding Automation to your Word forms.
http://www.computorcompanion.com/LPMArticle.asp?ID=46

Part 3: Learn more VBA (macros) to automate your forms.
http://www.computorcompanion.com/LPMArticle.asp?ID=119

Part 4: Use custom dialog boxes in your Word forms
http://www.computorcompanion.com/LPMArticle.asp?ID=127

Part 5: Connect your AutoForm to a database to save input time and keep
better records!
http://www.computorcompanion.com/LPMArticle.asp?ID=136


--
Hope this helps.

Please reply to the newsgroup unless you wish to avail yourself of my
services on a paid consulting basis.

Doug Robbins - Word MVP

"birdbrain64" wrote in message
...
We have many processes that vary from 1 step to 100 steps. formatting is
always a nightmare. How would you create a template that is expandable.
Please help me understand how to create a template based on this format:

OP-015 Exempting Generation Resources from Uninstructed Deviation
Document Change History
Issue No
Reason for Issue
Revised By
Issue Date
Effective Date
Owner Approval
OP-015-0
Creation of Procedure
MISO Staff
11/01/06
12/1/06
Yes
15.1 Overview
Under the provisions of EMT Section 40.3.4, "Generation Resources shall
not
be subject to Uninstructed Deviation Penalties for any Uninstructed
Deviation
caused solely by events or conditions beyond the control, and without the
fault or negligence, of the Market Participant, including but not limited
to:
(1) Emergencies;
(2) Test mode of the Resource; or
(3) Start-up or shut-down mode of the Generation Resource; or
(4) Instances when a Generation Resource trips and goes off-line after
receiving Dispatch Instructions from the Transmission Provider. "
15.2 Procedure
Midwest ISO will grant exemption from Uninstructed Deviation Penalties in
the following circumstances:
15.3 Unit Starts - When a Generation Operator calls to inform the Midwest
ISO that a Generation Resource has synchronized with the grid. The Start
instruction (issued by Midwest ISO in either the Day Ahead Energy Market,
Forward Reliability Assessment and Commitment ("RAC"), Intra-Day RAC or
Real
Time Energy Market) indicates when the Resource(s) should be online and
available for dispatch instructions. Uninstructed Deviation Penalty
Exemption
(UDE) will be granted from the time the Generation Operator calls to
inform
the Regional Generation Dispatcher (RGD) that the unit has synchronized to
the transmission grid through the startup period as defined in the Unit
offer. Normally this will be the cold startup time but could also be the
intermediate or hot startup time, depending upon the state of the unit.
For
Quick Start Generation Resources (i.e., units that have startup of 15
minutes
or less), UDE will be given for the hour in which the unit synchronizes if
it
occurs between the top of the hour and 45 minutes past the top. If a Quick
Start Generation Resource synchronizes between 46 minutes past the top of
the
hour and the top of the following hour, UDE will be granted for two hours
(the hour in which the Resource synchronizes and the next hour). If this
period of time (when the unit synchronizes to the grid plus startup time)
extends past the Midwest ISO issued Start Time, UDE will not be granted
past
the Midwest ISO issued Start Time.
In all cases, the Generation Operator must contact their Midwest ISO
Regional Generation Dispatcher to be granted UDE - according to the
provisions laid out in this document.
Notification Requirements
MISO Real Time Operating Procedure
Page 2 of 3
Effective December 1st 2006
. Generation Operator to contact MISO Regional Generation Dispatcher any
time a unit synchronizes to the grid.
. Generation Operator to contact MISO Regional Generation Dispatcher any
time a unit that has been synchronized to the grid will not be available
for
dispatch at the Midwest ISO issued start time.
. Any unit with a Startup time of 30 minutes or less requires only one
call
to the MISO Regional Generation Dispatcher - at the time it synchronizes
to
the grid.
15.4 No MISO Start - Units that do not have a Midwest ISO start and have
not
called at least 30 minutes prior to synchronizing with the grid will not
receive UDE. However, units that are started by a Generation Operator for
reliability reasons will be provided UDE at the Participant's request for
the
startup and shutdown periods.
15.5 Economic Decision - If a Participant receives a Midwest ISO start and
chooses not to start because of economics, the Midwest ISO RGD will give
the
unit a "Stop by Company" (also called an "Unavailable by Company Stop").
This
is done so that these units will not appear to be online in subsequent RAC
calculations. If the unit comes online during the remainder of the
original
Midwest ISO commitment period, the unit will not be eligible for UDE
unless
the unit was called on by Midwest ISO.
15.6 Generation Resource Shutdown- The Stop instruction (issued by Midwest
ISO in either the Day Ahead Energy Market, Forward RAC, Intra-Day RAC or
Real
Time Energy Market) indicates when the unit is released from following
dispatch instructions, not when the unit should be offline. UDE will be
provided at the time of the Midwest ISO issued Stop time for up to the
length
of startup time in the Resource Offer. If the Generation Operator wants to
take the unit below Economic Minimum before the Stop Time issued by
Midwest
ISO, UDE will not be provided until the Stop Time.
15.7 Equipment failure - If a unit experiences mechanical difficulties,
(i.e., failure of pumps, fans, mills, etc.) UDE will be granted for a
maximum
of one Hour (up to two Hour Endings) so that Generation Operators may
update
their offer. Midwest ISO Regional Generation Dispatchers will also update
offers if requested for the same period of time.
UDE will not be granted for extended periods of time except for issues
that
directly affect a Resource's ability to follow dispatch instructions.
Examples of this would be wet coal, new control systems or a failure of
portions of a Resource's control system. Units that are returning from a
major overhaul would also qualify for extended UDE if requested for a
reasonable period of time in which to stabilize the unit. In all other
cases,
UDE will be provided for a maximum of two hours so a Generation Operator
can
update its offer.
15.8 Resource testing- Prior to a unit coming online for testing, the
Generation Operator must call the Midwest ISO Regional Generation
Dispatcher
(RGD), indicate the duration of the proposed test and obtain approval for
the
test. If the test is approved, UDE will be granted for the duration of the
test. If Midwest ISO cannot approve the test, UDE will not be granted.
Reasons for not
MISO Real Time Operating Procedure
Page 3 of 3
Effective December 1st 2006
granting the test may include, but are not limited to, energy needs on a
peak day, energy surplus conditions or if a unit may be needed to address
congestion.
15.9 Resources Trips- If a unit is online and suddenly goes offline (i.e.,
the Resource goes from generating energy to zero output in less than 15
minutes), UDE will be granted for the Hour(s) in which the trip occurred
if
requested by the Generation Operator.
15.10 Manual Redispatch - Units that are directed to move as part of
Manual
Redispatch and follow Midwest ISO instructions will be granted UDE for the
duration of the event.
15.11 Dynamically Scheduled JOUs- When any share (physical or commercial
share of a Dynamically Scheduled Unit) is granted UDE, all shares shall be
granted UDE.



Reply
Thread Tools
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Sharing templates on the network [email protected] Microsoft Word Help 1 May 20th 06 12:56 AM
Mail Merge Templates from Multiple Templates Programmatically BP Mailmerge 1 April 7th 06 02:50 PM
Normal.dot Issue PA New Users 7 August 7th 05 04:40 PM
Get 'Workgroup Templates' to show up in 'New Document' Task Pane? Brian In Phoenix Microsoft Word Help 3 July 15th 05 04:01 AM
Templates in too many languages. Only need English. capt_dalton Microsoft Word Help 0 December 2nd 04 10:29 PM


All times are GMT +1. The time now is 01:40 PM.

Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 Microsoft Office Word Forum - WordBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Word"